The devil is always in the details and this project has been no exception. There were some typos on the plans that caused the basement to be built 6 feet too short. (Whups) Fortunately the basement subcontractor and the general contractor came to an understanding in seconds and the error corrected with incredible speed. Had I not actually gone out there when the basement walls were being framed, I think I would have missed it completely.
Here is a pictorial representation of the process as it has gone along so far. Click on any picture to get a larger image. Note that most larger images have a date stamp on them. This will give you an idea of time it takes to complete each phase.
Basement |
Digging |
First Scoop
|
Big hole
|
|
|
|
Wall Construction |
Footers
|
Wall Forms
|
Leaking Concrete
|
Finished Walls
|
|
Basement Framing |
Poured floor
|
Entertainment Cntr
|
Bedrooms/Bath
|
Backfilled
|
Main Floor |
Framing Start |
Garage
|
Main House
|
Front Entry
|
Porte Cache Pillars
|
|
|
Back of House
|
Back of Garage
|
Garage/Workshop
|
Porte Cache/Library
|
|
|
Columns & Arches on Patio
|
View from front of house standing on roof
|
Porte cache drive-through
|
|
|
Framing Wrapup |
Framing Completed, Interior work begun
|
|
|
|
Interior Details |
Main house |
Foyer ceiling in entry
|
Library ceiling
|
Stair landing w/ furring strips
|
Master bath glass block glass walls
|
|
Dumbwaiter |
Dumbwaiter buildout in pantry
|
Dumbwaiter motor assembly
|
|
|
|
Structured wiring |
Structured wiring home run panels in office closet
|
|
|
|
|
Garage Workshop |
Duplex outlet detail--separate circuits to top and bottom outlets.
|
|
|
|
|
Insulation |
Batting for hard-to-reach places
|
Blown cellulose for everywhere else
|
|
|
|
Drywall |
Covering the walls
|
Circular stairwell
|
Taping the hung Drywall
|
Glad I don't do this!
|
|
Cabinets |
Start of kitchen cabinet install
|
Two islands, base and upper units
|
Left unit for ovens, microwave
|
Doors Installed |
|
|
Base Unit Doors
|
|
|
|
|
Countertops |
Granite countertops--"Paradisio Classico"
|
This one weighed 800 pounds...(!)
|
New house syndrome starts to form.
|
Backsplashes Added
|
|
|
Digging out a switch thru granite and drywall.
|
Kitchen columns installed |
|
|
|
Floor Tiles & Flooring |
Initial delivery of tile
|
Floors start to take shape
|
Starburst pattern for entryway
|
Library floor (cherry) |
|
Lights |
Entry Light |
Dining Room Light |
|
|
Exterior Progress |
Windows |
Windows in!
|
|
|
|
|
Siding |
Styrofoam insulation on outside applied.
|
Library w/ main electrical panel
|
Patio with foam applied
|
|
|
Doors |
Door style for exterior doors
|
French doors on back Patio
|
|
|
|
Roof |
Staging of roof tiles prior to installation
|
Another job for the young.
|
Thought we'd blown the color, but was just dirty tile!
|
|
|
Stucco |
They put an initial ("scratch") coat on.
|
Then finish it with the final one.
|
|
|
|
Paint |
Anguished decision.
|
|
|
|
|
Lights |
Front Entry lights
|
|
|
|
|
Back |
Next |
|
|
|